Tank Farm

$5M – $7M | Portsmouth, RI | NextEra Energy

This project included the installation of all DC block electrical components to include PV harness and DC conductors, the installation of DC-AC string inverters, central AC switchboards, MV sectionalizing cabinets, and MV circuits to new POI at 25kV OH distribution. PPS also provided COMMS infrastructure and installation of Meteorological stations.

PPS self-performed site-civil as related to the electrical scope, concrete foundations, DC circuitry, LV AC circuitry, and MV circuitry. PPS also coordinated and assisted with interconnect and obtaining cut-in card with local authorities.