Stagecoach

$6M – $9M | Andersonville, GA | Competitive Power Ventures

This project included the installation of a TE Connectivity PV Harness with CAB system for a 100MW tracker system, installation of 23 central inverters, and all MV circuitry to POI at the substation.

PPS also installed meteorological stations and PV communications infrastructure.

PPS performed all site-civil works as incidental to the electrical SOW and 100% of the PV system electrical.