by Slamdot Hostmaster | May 12, 2023
DOD Medical $3M – $6M | DOD This project includes the design and replacement of a 5kV Switchgear serving critical HVAC equipment for one of the ARMY’s premier research facilities. Temporary power and switchgear will be required during cutover to the new...
by Slamdot Hostmaster | May 12, 2023
Whiting Field Substation $1M – $3M | Whiting Field, FL | PowerSecure This project included the clearing and grubbing of an existing site, establishing grade, new substation ground-grid and top-rock. PPS installed new utility transformers, primary metering and...
by Slamdot Hostmaster | May 12, 2023
15KV Primary Upgrade (Phase II) $3M – $5M | Naval Installation | NAVFAC PPS will install new concrete encased duct bank for a new Underground distribution system to replace existing Overhead primary. PPS will install two new primary switches and three new...
by Slamdot Hostmaster | May 12, 2023
15KV Primary Upgrade (Phase I) $3M – $5M | Naval Installation | NAVFAC This project required close coordination with naval personnel to mitigate outage duration during final cut-over. PPS employed a temporary power plan consisting of two 1MW temp gens and five...
by Slamdot Hostmaster | May 12, 2023
OH to UG (Corry Field) $1M – $3M | Corry Field, Nas Pensacola | PowerSecure PPS executed the following in support of the installation’s mission: Engineering and design collaboration; Demolition and material removal of existing primary pad-mounted transformers,...