DOD Medical

DOD Medical $3M – $6M | DOD This project includes the design and replacement of a 5kV Switchgear serving critical HVAC equipment for one of the ARMY’s premier research facilities. Temporary power and switchgear will be required during cutover to the new...

Whiting Field Substation

Whiting Field Substation $1M – $3M | Whiting Field, FL | PowerSecure This project included the clearing and grubbing of an existing site, establishing grade, new substation ground-grid and top-rock. PPS installed new utility transformers, primary metering and...

15KV Primary Upgrade (Phase II)

15KV Primary Upgrade (Phase II) $3M – $5M | Naval Installation | NAVFAC PPS will install new concrete encased duct bank for a new Underground distribution system to replace existing Overhead primary. PPS will install two new primary switches and three new...

15KV Primary Upgrade (Phase I)

15KV Primary Upgrade (Phase I) $3M – $5M | Naval Installation | NAVFAC This project required close coordination with naval personnel to mitigate outage duration during final cut-over. PPS employed a temporary power plan consisting of two 1MW temp gens and five...

OH to UG (Corry Field)

OH to UG (Corry Field) $1M – $3M | Corry Field, Nas Pensacola | PowerSecure PPS executed the following in support of the installation’s mission: Engineering and design collaboration; Demolition and material removal of existing primary pad-mounted transformers,...