Emergency Power Upgrades
$1M – $5M | Kennedy Space Center | 45th Force Support Squadron
PPS performed the demolition and installation of a new Emergency Power System at Jonathan Dickinson Missile Tracking Annex (JDMTA).
This project required the demolition of five existing gensest and replacement with three new 800kW gensets, paralleling switchgear and automatic transfer switches.
This project utilized Tier 4 gensets and required meticulous outage scheduling in conjunction with the radar’s mission.