4000A Switchgear Replacement

$3M – $5M | Lackland AFB, FL | Herman Construction Group

PPS supplied turn-key electrical services in support of the 4000A Switchgear upgrade at the Lackland Medical Clinic.

PPS was responsible for connecting existing electrical panels to a new switchgear, installing generator connection points and manual transfer switches to allow for the connection of portable generators, removal of existing switchgear and generator, installation of new, battery backed up emergency lights and exit signs on 6 floors. This project also encompassed the replacement of 300KVA UPS for elevator and refrigeration equipment.